PARKING LOT

Parking repairs in the hourly parking lot will be rearranged to improve the location of, and provide additional spaces for employees with medical/reserved parking privileges.

The parking lot will be cleaned and repaired as required and necessary arrangements will be made to prevent large accumulations of glass. Also, to assist in the elimination of debris, large rubbish containers will be provided. During the winter months, the Company will make appropriate arrangements for the expeditious removal of snow from roadways and parking areas. However, the parties recognize and acknowledge that all employees have a basic responsibility to conduct themselves in a manner conducive to good housekeeping and cleanliness when using the parking lot, and that without their full cooperation, the daily conditions desired by WSP employees cannot be attained.

The parking lot sweeping and cleaning currently being performed by included personnel will continue to be performed by included personnel. Nothing in this understanding will change the existing practices.

The Company and the Union recognize that employees have a responsibility to assist the Company in maintaining the parking lot. In this regard, trash containers have been placed in the parking lot. These containers will be emptied on a weekly basis.

A television scanner will be provided in an effort to maximize parking lot security.

The parking lot drains will be cleaned and maintained in order to provide proper drainage for the parking lot.

A booster battery and cables will be available on a Security vehicle to assist hourly employees start their car. However, it will be the responsibility of the hourly employee to make the necessary connections.

CLEANING SCHEDULE

With respect to cleaning the parking lot, the Company will review the present cleaning schedule. Efforts will be made to utilize the yard sweeper in cleaning the parking lot, when the plant schedule and parking lot availability exists. This will be done on a monthly basis (weather permitting), or as agreed upon by the parties. It must be understood, however, that the total efforts of all employees must be demonstrated, in order to keep the parking lot in a condition which is satisfactory to all concerned.

IMPROVEMENTS

A designated walkway will be striped along the west side of the guard posts along the main drive into the hourly parking lot. This walkway will be fifteen feet wide and parking in the walkway will not be tolerated. In addition the parking lot will be re-striped and the parking spaces will be widened.

LIGHTS

During the 1999 Local Negotiations, it was agreed that two additional lights will be installed in the hourly parking lot.

NORTH DRAIN

The North end drain system will be cleaned and repaired as required in order to provide proper drainage for the parking lot. To assist in the elimination of debris which causes the drain to plug up, the rubbish containers must be utilized. Both parties recognize and acknowledge that all employees have a basic responsibility to conduct themselves in a manner conducive to good housekeeping and cleanliness when using the parking lot.

*Indicates language change from 1999 Agreement   Indicates New Language