PARKING
LOT
Parking repairs in the hourly parking lot will be
rearranged to improve the location of, and provide additional
spaces for employees with medical/reserved parking privileges.
The parking lot will be cleaned and repaired as required and
necessary arrangements will be made to prevent large accumulations
of glass. Also, to assist in the elimination of debris, large
rubbish containers will be provided. During the winter months, the
Company will make appropriate arrangements for the expeditious
removal of snow from roadways and parking areas. However, the
parties recognize and acknowledge that all employees have a basic
responsibility to conduct themselves in a manner conducive to good
housekeeping and cleanliness when using the parking lot, and that
without their full cooperation, the daily conditions desired by
WSP employees cannot be attained.
The parking lot sweeping and cleaning currently being performed by
included personnel will continue to be performed by included
personnel. Nothing in this understanding will change the existing
practices.
The Company and the Union recognize that employees have a
responsibility to assist the Company in maintaining the parking
lot. In this regard, trash containers have been placed in the
parking lot. These containers will be emptied on a weekly basis.
A television scanner will be provided in an effort to maximize
parking lot security.
The parking lot drains will be cleaned and maintained in order to
provide proper drainage for the parking lot.
A booster battery and cables will be available on a Security
vehicle to assist hourly employees start their car. However, it
will be the responsibility of the hourly employee to make the
necessary connections.
|
CLEANING SCHEDULE
With respect to cleaning the parking lot, the
Company will review the present cleaning schedule. Efforts will be
made to utilize the yard sweeper in cleaning the parking lot, when
the plant schedule and parking lot availability exists. This will
be done on a monthly basis (weather permitting), or as agreed upon
by the parties. It must be understood, however, that the total
efforts of all employees must be demonstrated, in order to keep
the parking lot in a condition which is satisfactory to all
concerned.
|
IMPROVEMENTS
A designated walkway will be striped along the
west side of the guard posts along the main drive into the hourly
parking lot. This walkway will be fifteen feet wide and parking in
the walkway will not be tolerated. In addition the parking lot
will be re-striped and the parking spaces will be widened.
|
LIGHTS
During the 1999 Local Negotiations, it was agreed
that two additional lights will be installed in the hourly parking
lot.
|
NORTH DRAIN
The North end drain system will be cleaned and
repaired as required in order to provide proper drainage for the
parking lot. To assist in the elimination of debris which causes
the drain to plug up, the rubbish containers must be utilized.
Both parties recognize and acknowledge that all employees have a
basic responsibility to conduct themselves in a manner conducive
to good housekeeping and cleanliness when using the parking lot.
|
|