BASEMENT
- HOUSKEEPING
It is the intent of the Company to maintain the
basement in such a manner as to assure safe working conditions.
Additional drip pans, sumps, or other facility changes will be
undertaken to alleviate the problem, if necessary.
|
BASEMENT-QUAD
HUT
During
1999 Local Negotiations, it was agreed that a Quad Hut will be
installed in the basement.
|
BATTERY
CHANGING STATION - LIFT TRUCKS
Under the present operational system rotational
assignments for those employees assigned to the Lift Truck
Battery Changing Station have been reviewed with Plant Engineering
Department Supervision. Consideration of individual requests as
well as the practicality of regular rotation has been reviewed.
The Company recognizes that at the present time the system
specifically discussed in Local Negotiations is operational on at
least one shift.
|
|
**BATTERY STATION
During
the 2003 Negotiations, the Union complained that the battery
storage area was not being cleaned on a regular basis. The
Company agrees to maintain the cleanliness of the battery station
weekly.
|
*BENCHES
Two benches
will be maintained outside the hourly lobby.
|
*BENEFITS
/ TOLL-FREE NUMBER
During
1999 Local Negotiations, it was agreed that the Company would
provide a toll-free phone number for the workforce, both active
and retirees, to contact the UAW Benefits Representative (1-800-367-3998).
|
**BICYCLE
PARKING
During
the 2003 Local Negotiations, it was agreed that the Company will
provide bicycle parking for the convenience of the employees who
ride bicycles to work.
|